Categories...

File: Batu Bara Untuk Energi Listrik

Category: editorial October 07, 2019. Credit:

DESCRIPTION (EN)

An officer is overseeing a conveyor belt carrying 7,500 megatons of coal from Bontang, East Kalimantan, for the fuel needs of the Tanjung Awar-awar Steam Power Plant (PLTU), with a capacity of 2x350 megawatts (MW) in Tuban Regency, East Java, Tuesday (25) / 10). Every hour Tanjung Awar-Awar power plant requires 160 tons of good quality coal to produce 700 MW of electricity. With the operation of two power plants in the Tanjung Awar-awar power plant using technology from China, it will further increase the availability of electricity supply in East Java, which when the peak load needs reaches 5,620 MW. - JP / Wahyoe Boediwardhana / Adi / 19


DESCRIPTION (ID)

Seorang petugas tengah mengawasi conveyor belt yang mengangkut 7.500 megaton batu bara dari Bontang, Kalimantan Timur, untuk kebutuhan bahan bakar Pembangkit Listrik Tenaga Uap (PLTU) Tanjung Awar-awar, berkapasitas 2x350 megawatt (MW) di Kabupaten Tuban, Jawa Timur, Selasa (25/10). Tiap jam PLTU Tanjung Awar-awar membutuhkan 160 ton batu bara kualitas bagus untuk menghasilkan 700 MW listrik. Dengan dioperasikannya dua pembangkit di PLTU Tanjung Awar-awar menggunakan teknologi dari Cina, semakin menambah ketersediaan pasokan energi listrik di Jawa Timur, yang saat beban puncak kebutuhannya mencapai 5.620 MW. - JP/Wahyoe Boediwardhana/Adi/19


PURCHASE THIS IMAGE

Download

Keyword