Categories...

File: Produksi emas PT BSI Banyuwangi naik

Category: editorial November 01, 2019. Credit:

DESCRIPTION (EN)

Mining activities of rocks containing gold and silver from the top of the hill, in the gold and silver mine complex PT Bumi Suksesindo (BSI), in Sumberagung Village, Pesanggaran District, Banyuwangi Regency, Saturday (14/4). In 2018 PT BSI targets to be able to mine 170,000 ounces of gold ore, with mining production costs reaching USD 110.5 million. The PT BSI mine has a 9-year mine plan, with a total production of 1 million ounces of gold and 2.8 million ounces of silver. - JP / Wahyoe Boediwardhana / Adi / 19


DESCRIPTION (ID)

Kegiatan penambangan bebatuan mengandung emas dan perak dari puncak bukit, di komplek tambang emas dan perak PT Bumi Suksesindo (BSI), di Desa Sumberagung, Kecamatan Pesanggaran, Kabupaten Banyuwangi, Sabtu (14/4). Tahun 2018 ini PT BSI menargetkan akan mampu menambang 170.000 ons biji emas, dengan biaya produksi tambang mencapai USD110,5 juta. Tambang PT BSI memiliki rencana tambang selama 9 tahun, dengan total produksi 1 juta ons emas dan 2,8 juta ons perak. - JP/Wahyoe Boediwardhana/Adi/19


PURCHASE THIS IMAGE

Download

Keyword