File: Produksi emas PT BSI Banyuwangi naik
Category: editorial November 01, 2019. Credit:DESCRIPTION (EN)
A Scania truck carrying rocks containing gold and silver with a capacity of 80-100 tons, was passing in front of a hill containing un mined ore, in the PT Bumi Suksesindo gold and silver mining complex (BSI), in Sumberagung Village, Pesanggaran District, Banyuwangi Regency, Saturday (4/14). In 2018 PT BSI targets to be able to mine 170,000 ounces of gold ore, with mining production costs reaching USD 110.5 million. The PT BSI mine has a 9-year mine plan, with a total production of 1 million ounces of gold and 2.8 million ounces of silver. - JP / Wahyoe Boediwardhana / Adi / 19
DESCRIPTION (ID)
Sebuah truk Scania membawa bebatuan mengandung emas dan perak berkapasitas 80-100 ton, tengah melintas di depan bukit mengandung ore yang belum ditambang, di komplek tambang emas dan perak PT Bumi Suksesindo (BSI), di Desa Sumberagung, Kecamatan Pesanggaran, Kabupaten Banyuwangi, Sabtu (14/4). Tahun 2018 ini PT BSI menargetkan akan mampu menambang 170.000 ons biji emas, dengan biaya produksi tambang mencapai USD110,5 juta. Tambang PT BSI memiliki rencana tambang selama 9 tahun, dengan total produksi 1 juta ons emas dan 2,8 juta ons perak. - JP/Wahyoe Boediwardhana/Adi/19