Categories...

File: Produksi emas PT BSI Banyuwangi naik

Category: editorial November 01, 2019. Credit:

DESCRIPTION (EN)

An officer is watching a Scania truck carrying 80-100 tons of gold and silver rocks, crossing in front of a hill containing un mined ore, in the PT Bumi Suksesindo gold and silver mining complex (BSI), in Sumberagung Village, Pesanggaran District, Banyuwangi Regency , Saturday (4/14). In 2018 PT BSI targets to be able to mine 170,000 ounces of gold ore, with mining production costs reaching USD 110.5 million. The PT BSI mine has a 9-year mine plan, with a total production of 1 million ounces of gold and 2.8 million ounces of silver. - JP / Wahyoe Boediwardhana / Adi / 19


DESCRIPTION (ID)

Seorang petugas tengah mengawasi truk Scania membawa bebatuan mengandung emas dan perak berkapasitas 80-100 ton, melintas di depan bukit mengandung ore yang belum ditambang, di komplek tambang emas dan perak PT Bumi Suksesindo (BSI), di Desa Sumberagung, Kecamatan Pesanggaran, Kabupaten Banyuwangi, Sabtu (14/4). Tahun 2018 ini PT BSI menargetkan akan mampu menambang 170.000 ons biji emas, dengan biaya produksi tambang mencapai USD110,5 juta. Tambang PT BSI memiliki rencana tambang selama 9 tahun, dengan total produksi 1 juta ons emas dan 2,8 juta ons perak. - JP/Wahyoe Boediwardhana/Adi/19


PURCHASE THIS IMAGE

Download

Keyword