Categories...

Jembatan Pulau Batam dengan Pulau Bintan

Category: editorial December 29, 2019. Credit:

DESCRIPTION (EN)

An official from the Ministry of PUPR explained about the Babin Bridge DED to the Acting Governor of Riau Islands Isdianto (left) and Deputy III for Infrastructure Coordinating Ministry of Maritime and Investment Coordinator Ridwan Djamaluddin when reviewing the locations that will be used for the Batam-Bintan Bridge (Babin) Bridge construction site, Saturday. (12/28). The final decision on the plan to build a bridge connecting Batam Island with Bintan Island along 7 kilometers is now in the hands of President Joko Widodo. The Ministry of Public Works and Public Housing (PUPR) has completed the Bridge Engineering Detail Design (DED) which requires construction costs of Rp 7.3 Trillion.-JP / Fadli / Adi / 19


DESCRIPTION (ID)

Pejabat dari Kementerian PUPR menjelaskan mengenai DED Jembatan Babin kepada Pelaksana Tugas Gubernur Kepri Isdianto (kiri) dan Deputi III Bidang Koordinasi Infrastruktur Kementerian Koordinator Maritim dan Investasi Ridwan Djamaluddin saat meninjau lokasi yang akan dijadikan tapak-tapak pembangunan Jembatan Batam- Bintan (Babin), Sabtu (28/12). Keputusan akhir rencana pembangunan jembatan yang menghubungkan Pulau Batam dengan Pulau Bintan sepanjang 7 Kilometer kini berada ditangan Presiden Joko Widodo. Kementerian Pekerjaan Umum dan Perumahan Rakyat (PUPR) telah merampungkan Detail Engineering Design (DED) Jembatan yang membutuhkan biaya pembangunan senilai Rp 7,3 Triliun.-JP/Fadli/Adi/19


PURCHASE THIS IMAGE

Download

Keyword