Categories...

Economic Minister Darmin Nasution at the construction of MRT Jakarta

Category: editorial November 11, 2018. Credit: Seto Wardhana

DESCRIPTION (EN)

MRT President Director William Sabandar (left) and Coordinating Economic Minister Darmin Nasution chat inside the construction of MRT Senayan Station, South Jakarta on June 11, 2018. MRT Jakarta President director, William sabandar stated that as for June 2018 MRT constuction progress has reached 94,2% (96,59% underground, 91,82 % aboveground) and the service is expected to begin operating in March 2019. TJPImages/Seto Wardhana/adi/18


DESCRIPTION (ID)

Presiden direktur MRT Jakarta, William Sabandar (kiri) berjalan dengan Menteri koordinator perekonomian Darmin Nasution di dalam konstruksi stasiun MRT Bundaran HI, Jakarta, 25 Juni 2018. Presiden direktur MRT Jakarta, William Sabandar mengatakan bahwa hingga Juni 2018, konstruksi MRT sudah mencapai 94.2% (96.59% stasiun bawah tanah dan 91.82% stasiun layang) diharapkan dapat beroperasi bulan Maret 2019. TJPImages/Seto Wardhana/adi/18


PURCHASE THIS IMAGE

Download

Keyword